{"id":3010,"date":"2025-11-25T08:50:47","date_gmt":"2025-11-25T06:50:47","guid":{"rendered":"https:\/\/www.mkc.gr\/project\/kataskevi-3-diorofon-katoikion\/"},"modified":"2025-12-09T11:45:39","modified_gmt":"2025-12-09T09:45:39","slug":"construction-of-3-two-storey-houses","status":"publish","type":"project","link":"https:\/\/www.mkc.gr\/en\/project\/construction-of-3-two-storey-houses\/","title":{"rendered":"Construction of 3 Two-Storey Houses"},"content":{"rendered":"<p>Construction of three two-storey houses with a basement, totaling 360 square meters, and three swimming pools. The project is located at 38\u201340 Zymvrakakidon Street, started in October 2021, and was completed in May 2022.<\/p>\n","protected":false},"featured_media":3012,"parent":0,"template":"","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":""},"project_type":[159,158],"class_list":["post-3010","project","type-project","status-publish","has-post-thumbnail","hentry","project_type-construction-works","project_type-indicative-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mkc.gr\/en\/wp-json\/wp\/v2\/project\/3010","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mkc.gr\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.mkc.gr\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mkc.gr\/en\/wp-json\/wp\/v2\/media\/3012"}],"wp:attachment":[{"href":"https:\/\/www.mkc.gr\/en\/wp-json\/wp\/v2\/media?parent=3010"}],"wp:term":[{"taxonomy":"project_type","embeddable":true,"href":"https:\/\/www.mkc.gr\/en\/wp-json\/wp\/v2\/project_type?post=3010"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}